{"id":18961,"date":"2026-10-12T11:00:26","date_gmt":"2026-10-12T15:00:26","guid":{"rendered":"https:\/\/www.buildxact.com\/us\/?p=36430"},"modified":"2026-10-13T16:50:17","modified_gmt":"2026-10-13T04:50:17","slug":"construction-contingency-how-to-budget-for-the-unexpected","status":"publish","type":"post","link":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/","title":{"rendered":"Construction Contingency: How to Budget for the Unexpected"},"content":{"rendered":"\n<p>So your project starts with a healthy margin. Then, out of nowhere, an unexpected issue appears. Maybe excavation uncovers poor soil. Maybe material prices jump before you place an order. Maybe a remodel reveals damage hidden behind walls. Suddenly, the profit you worked hard to build into the job starts slipping away.<\/p>\n\n\n\n<p>Unexpected costs are an inevitable part of any construction project. The problem is when you don\u2019t have a clear plan for dealing with them when they arise.<\/p>\n\n\n\n<p>Your construction contingency acts as your profit protector. A well-managed contingency helps absorb unforeseen costs without throwing the entire project budget off course. It gives you greater control over profitability, helps reduce financial stress during the build, and creates a buffer when conditions change.<\/p>\n\n\n\n<p>In this guide, we&#8217;ll explain how construction contingency works, how to calculate your project contingency, and when you should actually use it. Plus, download our free construction contingency budget template for an easy way to record, track, and manage your contingencies across every project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is Contingency in Construction?<\/h2>\n\n\n\n<p>In simple terms, a construction contingency is money set aside in a <a href=\"https:\/\/www.buildxact.com\/us\/blog\/building-construction-budget\/\">project budget<\/a> for costs that weren&#8217;t known when the job was estimated.<\/p>\n\n\n\n<p>Even the most experienced builders can&#8217;t predict every condition they&#8217;ll encounter on site, so contingency helps account for these unknowns before they become budget problems.<\/p>\n\n\n\n<p>On a residential construction project, you might encounter contingency expenses like:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Unexpected rock, groundwater, or poor soil found during excavation<\/li>\n\n\n\n<li>Rotten framing, termite damage, or structural issues uncovered during a remodel<\/li>\n\n\n\n<li>Additional site preparation work required before construction can continue<\/li>\n\n\n\n<li>Material price increases after the job has been bid<\/li>\n\n\n\n<li>Unexpected plumbing, electrical, or sewer issues discovered during construction<\/li>\n\n\n\n<li>Additional labor needed to address unforeseen site conditions<\/li>\n\n\n\n<li>Weather-related delays that create additional project costs<\/li>\n\n\n\n<li>Code or inspection requirements identified after work begins<\/li>\n<\/ul>\n\n\n\n<p>It&#8217;s equally important to understand what contingency doesn&#8217;t cover.<\/p>\n\n\n\n<p><strong>Contingency isn\u2019t the same as profit margin.<\/strong> Profit is the return your business earns for successfully delivering the project. Contingency is there to address uncertainty within the project itself.<\/p>\n\n\n\n<p><strong>Contingency also differs from an allowance. <\/strong>An allowance is a budget for a known item that hasn&#8217;t been fully selected yet, such as appliances, fixtures, or finishes. Contingency is reserved for costs that weren&#8217;t identified when the estimate was prepared.<\/p>\n\n\n\n<p>When you know how to use contingencies correctly, you can create more realistic budgets and effectively manage the financial risk that comes with any project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Types of contingency in residential construction<\/h3>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6ace45eace6c2&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6ace45eace6c2\" class=\"wp-block-image alignwide size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/L5pK_LS9pUa0aNvr9hHCQw\/UojRmTBBv0u157Zs7l6b2A\/Large\/Examples%20of%20Contingencies%20in%20Residential%20Construction.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Not all contingency funds are used the same way. Depending on the project, you may need to account for design changes, construction-related issues, or client-requested upgrades.&nbsp;<\/p>\n\n\n\n<p>Each type of contingency serves a specific purpose within the project budget and helps protect against different kinds of risks.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Design contingency&nbsp;<\/h4>\n\n\n\n<p>Design contingency covers costs that come up before construction begins, while plans, specifications, or project details are still being finalized.&nbsp;<\/p>\n\n\n\n<p>It&#8217;s most commonly used on custom homes, additions, and remodels where changes occur during design development.<\/p>\n\n\n\n<p><strong>You may need a design contingency to cover:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Plan revisions<\/li>\n\n\n\n<li>Additional engineering requirements<\/li>\n\n\n\n<li>Changes to specifications<\/li>\n\n\n\n<li>Updated material selections<\/li>\n\n\n\n<li>Design details that are finalized after estimating<\/li>\n<\/ul>\n\n\n\n<p>Without a design contingency, these changes can force repeated budget revisions before work even starts.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Construction contingency<\/h4>\n\n\n\n<p>Construction contingency covers unexpected costs that emerge after work begins.&nbsp;<\/p>\n\n\n\n<p>These are issues that weren&#8217;t visible during estimating and only become apparent once construction is underway.<\/p>\n\n\n\n<p><strong>Construction contingency is often used for:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Unforeseen site conditions<\/li>\n\n\n\n<li>Material cost increases<\/li>\n\n\n\n<li>Additional labor requirements<\/li>\n\n\n\n<li>Unexpected code compliance requirements<\/li>\n\n\n\n<li>Hidden issues uncovered during construction<\/li>\n<\/ul>\n\n\n\n<p>By accounting for these risks upfront, you can address problems as they arise while protecting your margins.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Owner contingency<\/h4>\n\n\n\n<p>Owner contingency is a separate reserve used for changes requested by the homeowner during construction.&nbsp;<\/p>\n\n\n\n<p>Keeping these costs separate from the builder&#8217;s contingency makes project costs easier to manage.<\/p>\n\n\n\n<p><strong>Owner contingency may be used for:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Upgraded finishes<\/li>\n\n\n\n<li>Additional features<\/li>\n\n\n\n<li>Scope changes requested by the homeowner<\/li>\n\n\n\n<li>Premium fixtures or appliances<\/li>\n\n\n\n<li>Expanded landscaping or outdoor living areas<\/li>\n<\/ul>\n\n\n\n<p>Separating owner-driven costs from construction-related contingencies helps maintain clearer budgets and prevents client-requested changes from affecting your original margins.<\/p>\n\n\n\n<p>Understanding the different types of contingency is only part of the equation. The next step is determining how much contingency your projects actually need. Get it wrong, and you risk exposing your margins or tying up cash unnecessarily.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Calculate Contingency<\/h2>\n\n\n\n<p>Although it would make things a lot easier, there&#8217;s no universal contingency amount that works for every project.&nbsp;<\/p>\n\n\n\n<p>A straightforward new build on a well-understood site may require a lower contingency than a remodel, where existing conditions won&#8217;t be fully known until demolition begins. The goal is to set a contingency that reflects how complex the work will be and the likelihood of unexpected costs.<\/p>\n\n\n\n<p>A simple way to calculate contingency is to apply a percentage to your total project costs.<\/p>\n\n\n\n<p><strong>Contingency = Total Project Costs \u00d7 Contingency Percentage<\/strong><\/p>\n\n\n\n<p>For example:<\/p>\n\n\n\n<p><strong><em>Project budget: <\/em><\/strong><em>$500,000<\/em><\/p>\n\n\n\n<p><strong><em>Contingency percentage: <\/em><\/strong><em>10%<\/em><\/p>\n\n\n\n<p><strong><em>$500,000 \u00d7 10% = $50,000 contingency<\/em><\/strong><\/p>\n\n\n\n<p>As a general guide, many residential builders use the following ranges:<\/p>\n\n\n\n<p><strong>Low-risk projects:<\/strong> 5% contingency<\/p>\n\n\n\n<p><strong>Medium-risk projects:<\/strong> 10% contingency<\/p>\n\n\n\n<p><strong>High-risk projects:<\/strong> 15% or more contingency<\/p>\n\n\n\n<p>The right percentage depends on factors such as project complexity, site conditions, design certainty, and the extent of remodeling.&nbsp;<\/p>\n\n\n\n<p>Some builders also adjust their contingency based on known project risks. If you&#8217;ve identified specific concerns during planning, such as difficult site access or potential utility issues, it may make sense to increase your contingency allowance accordingly.<\/p>\n\n\n\n<p>The goal isn&#8217;t to guess or arbitrarily choose a figure. It&#8217;s to set a contingency amount that reflects the realities of the project and provides a buffer in the face of unexpected costs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">When Should You Tap Your Contingency Funds?<\/h2>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6ace45eacf592&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6ace45eacf592\" class=\"wp-block-image alignwide size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/dKO0MRt3g0W4NlRphCCqKw\/geJ28RkOUECV7nuN9gW9LA\/Large\/What%20Does%20and%20Doesn%E2%80%99t%20Count%20as%20a%20Contingency%20Expense.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Knowing when to use your contingency funds is just as important as getting the percentage right.<\/p>\n\n\n\n<p>Remember, every dollar taken from contingency reduces the buffer available for the rest of the project. That&#8217;s why it\u2019s better not to approve contingency drawdowns automatically. Instead, you should assess the cost, document the reason, and determine whether the expense genuinely belongs in contingency.<\/p>\n\n\n\n<p>The following framework can help you decide whether an expense should be charged against contingency or allocated to another part of the project budget.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Contingency expense or not?<\/h3>\n\n\n\n<p>A simple way to assess an unexpected cost is to determine whether it was known, knowable, or genuinely unforeseen when the estimate was prepared.<\/p>\n\n\n\n<p>A cost is more likely to be a contingency expense if:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>It couldn&#8217;t reasonably have been identified before construction began<\/li>\n\n\n\n<li>It resulted from conditions discovered during the build<\/li>\n\n\n\n<li>It was outside the assumptions used to prepare the estimate<\/li>\n\n\n\n<li>It is required to complete the original scope of work<\/li>\n<\/ul>\n\n\n\n<p>A cost is less likely to be a contingency expense if:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>It was missed during the estimation<\/li>\n\n\n\n<li>It was a known project cost that wasn&#8217;t budgeted correctly<\/li>\n\n\n\n<li>It resulted from a planning or management issue<\/li>\n\n\n\n<li>It relates to overhead or profit targets rather than the project itself<\/li>\n<\/ul>\n\n\n\n<p>For example, uncovering an unexpected drainage issue during excavation would typically be a contingency expense. Forgetting to include drainage work in the estimate would not.<\/p>\n\n\n\n<p>Once an expense has been identified as a contingency, you\u2019ll need a system for tracking it. Accurate contingency reporting is crucial because it can reveal a great deal about a project&#8217;s financial health.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Track Contingency Drawdowns<\/h2>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6ace45eacfb65&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6ace45eacfb65\" class=\"wp-block-image alignwide size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/Dr2Xza2qeU-_lEwnk3og5Q\/zbT20nDSGkuUhBtLmLnpjw\/Large\/Step-By-Step%20Guide%20to%20Tracking%20Contingency%20Drawdowns.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Without a clear and structured process for tracking your contingency drawdowns, it&#8217;s easy to lose sight of remaining funds and miss opportunities to spot budget issues before they affect the overall project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Create a contingency budget line<\/h3>\n\n\n\n<p>Start by creating a dedicated contingency line within your project budget. This amount should be established before work begins and tracked separately from <a href=\"https:\/\/www.buildxact.com\/us\/ebook\/estimate-construction-costs\/\">construction costs<\/a>, overhead, and profit.&nbsp;<\/p>\n\n\n\n<p>Keeping contingency isolated makes it easier to see how much has been allocated, used, and retained throughout the project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Record each contingency expense<\/h3>\n\n\n\n<p>Every approved drawdown should be documented as soon as it occurs. Record the amount, date, and reason for the expense, along with any supporting notes or approvals.&nbsp;<\/p>\n\n\n\n<p>Consistent recordkeeping helps create a clear history of contingency usage and reduces confusion when reviewing project finances later.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Update the remaining balance<\/h3>\n\n\n\n<p>After each drawdown, update your contingency balance immediately. Maintaining a running total allows you to see how much funding remains available and helps prevent overspending.&nbsp;<\/p>\n\n\n\n<p>This step also provides a more accurate picture of the project&#8217;s financial position as work progresses.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Review contingency usage regularly<\/h3>\n\n\n\n<p>Contingency tracking shouldn&#8217;t only happen when a cost arises. Review contingency spending during regular budget and project reviews to identify patterns and assess whether the remaining allowance is still appropriate.&nbsp;<\/p>\n\n\n\n<p>Early visibility into contingency usage makes it easier to respond if costs start building up faster than expected.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Close out and evaluate<\/h3>\n\n\n\n<p>At project completion, compare total contingency spending against the original allowance. Reviewing where funds were used can reveal useful insights about estimating accuracy, project risks, and budgeting assumptions.&nbsp;<\/p>\n\n\n\n<p>These lessons can help improve contingency planning going forward and ensure healthy profit margins on future jobs.<\/p>\n\n\n\n<p>When every drawdown is recorded and reviewed, you\u2019ll get a stronger understanding of how projects are performing, which in turn leads to more informed budgeting decisions.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construction Contingency Budget Template: Free Download<\/h2>\n\n\n\n<p>Contingency planning is only valuable when it\u2019s easy to apply to actual projects. Our free Construction Contingency Budget Template makes it simple to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Calculate contingency allowances<\/li>\n\n\n\n<li>Record drawdowns<\/li>\n\n\n\n<li>Monitor remaining balances<\/li>\n\n\n\n<li>Maintain visibility into contingency spending throughout the project<\/li>\n<\/ul>\n\n\n\n<p>And because the template follows the same structure on every job, it&#8217;s easy to reuse across future projects, saving you countless hours in admin.<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/uv6FvgWMZUiCqVnOQ0mLPw\/mK515OK9PkyavrVNf7E1YA\/Original\/Buildxact%20-%20construction%20contingency%20template.docx\" data-type=\"link\" data-id=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/uv6FvgWMZUiCqVnOQ0mLPw\/mK515OK9PkyavrVNf7E1YA\/Original\/Buildxact%20-%20construction%20contingency%20template.docx\">Click here to download the free Construction Contingency Budget Template<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Construction Estimating Software Can Help You Budget Better<\/h2>\n\n\n\n<p>The stronger your budget is at the start of a project, the easier it becomes to manage contingency funds throughout the build.&nbsp;<\/p>\n\n\n\n<p>But when estimates, budgets, and job costs are managed manually, it can be difficult to <a href=\"https:\/\/www.buildxact.com\/us\/blog\/cost-control\/\">track changing costs<\/a> and understand their impact on remaining contingency funds. Small discrepancies can build up over time and, before you know it, you\u2019ve lost control of your project finances.<\/p>\n\n\n\n<p>One way to solve this challenge is with construction estimating software. By giving you a clearer view of project expenses both from the start and throughout the build, you can stay on top of costs and contingency funds, and spot potential risks before they hit your profits.<\/p>\n\n\n\n<p>For example, with a <a href=\"https:\/\/www.buildxact.com\/us\/blog\/builders-estimating-software\/\">leading construction estimating platform<\/a> like Buildxact, you can:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Create <a href=\"https:\/\/www.buildxact.com\/us\/features\/construction-estimating-software\/\">detailed project estimates<\/a> that form a stronger foundation for budgeting<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/7NVrX3muUEuYK6hr9M7XyA\/sZ-9yyS8XUSc27fplQnVdQ\/Large\/Buildxact%20Blu%20Estimate%20Generator.png?f=auto\" alt=\"\"\/><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Apply <a href=\"https:\/\/help.buildxact.com\/en\/articles\/7982795-how-do-i-use-the-pricing-assistant-in-buildxact-to-estimate-costs\">location-based material and labor costs<\/a> to improve estimate accuracy and protect margins<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Use <a href=\"https:\/\/www.buildxact.com\/us\/features\/builder-remodeler\/dealer-connection\/\">real-time dealer pricing<\/a> to keep budgets aligned with current market conditions\/IM<\/li>\n<\/ul>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6ace45ead0c79&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6ace45ead0c79\" class=\"wp-block-image alignwide size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/zkwU6TeK-0C7cHMaIJ8VhA\/V8E1J7Ds5kaEFKr-u4hdlw\/Large\/Buildxact%20Live%20Dealer%20Pricing..png?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Automatically connect estimate line items to <a href=\"https:\/\/www.buildxact.com\/us\/features\/construction-budgeting-software\/\">project budgets<\/a> without manual spreadsheet updates<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.buildxact.com\/us\/features\/construction-cost-tracking-software\/\">Track actual project costs<\/a> against the budget throughout the project<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/www.buildxact.com\/wp-content\/uploads\/2026\/08\/image-9.png\" alt=\"\" class=\"wp-image-36429\"\/><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reuse <a href=\"https:\/\/help.buildxact.com\/en\/articles\/3038614-how-do-i-create-an-estimate-template-in-buildxact\">estimate templates<\/a> to improve consistency across future projects<\/li>\n<\/ul>\n\n\n\n<p>The result is a budget that&#8217;s easier to manage, earlier visibility into cost pressures, and better protection for your margins when unexpected costs take you by surprise.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construction Contingency: FAQs<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">What is a typical contingency percentage in residential construction?<\/h3>\n\n\n\n<p>Many residential builders use contingency percentages ranging from 5% for lower-risk projects to 15% or more for projects with higher uncertainty. The right amount depends on factors such as site conditions, project complexity, remodeling scope, and design certainty. Projects with more unknowns typically require a larger contingency allowance to protect budgets and profitability.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Should contingency be included in a construction bid?<\/h3>\n\n\n\n<p>Yes. Including contingency in a construction bid helps account for unforeseen costs that may arise during the project. A realistic contingency allowance supports more accurate budgeting, reduces financial pressure when issues occur, and helps protect margins without requiring major budget revisions later in the build.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What happens if contingency funds aren&#8217;t used?<\/h3>\n\n\n\n<p>Unused contingency funds remain part of the project&#8217;s financial outcome. Depending on the contract structure, they may contribute to the builder&#8217;s final project margin or remain with the project owner. Either way, unused contingency isn&#8217;t a problem; it just means the project encountered fewer unforeseen costs than anticipated.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Protect Your Profit Margins With Buildxact\u2019s Streamlined Budgeting Tools<\/h2>\n\n\n\n<p>The best builders don&#8217;t leave project finances to chance. They build budgets that account for uncertainty, track costs closely, and make adjustments before small issues become expensive problems.<\/p>\n\n\n\n<p>Buildxact makes this easier by connecting estimating, budgeting, dealer pricing, and cost tracking in a single workflow. As project costs change, you can see the impact sooner, monitor budget performance more effectively, and manage contingency allowances with more precision.<\/p>\n\n\n\n<p>Equipped with better visibility into your finances, you can keep every project profitable without worrying about the unexpected.<\/p>\n\n\n\n<p>Ready to get started? Sign up for a <a href=\"https:\/\/app.buildxact.com\/us\/signup.html?_gl=1*vrh3ri*_gcl_au*NjUzMDg5MTEwLjE3Nzk5ODMyNzA.*_ga*MTA0ODg2MDQ3My4xNzc5OTgzMjYz*_ga_7JE2XW9RBL*czE3ODIyMzUwMDQkbzIzJGcxJHQxNzgyMjM1MDA5JGo1NSRsMCRoMTUwOTMxNTY0OQ..*_fplc*Z1N4WUQlMkY2OSUyQkhZRlNkaFQzQzNVMlhCbmZ1cEtIWHdJaTA4aFpaSzVxTyUyRnhmTVdnMzNSRjlidG5xV1lRSSUyQm92JTJGUWFOcjJHV050YVlRMnRpSERFSTIwbTV2cDFPQ3B3R20zSE5BTmVqSnpGaVBPT0VLR2VPaWd4OXFpQXNQQSUzRCUzRA..\">free trial<\/a> today or <a href=\"https:\/\/www.buildxact.com\/us\/schedule-a-demo\/\">book an interactive demo<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>So your project starts with a healthy margin. Then, out of nowhere, an unexpected issue appears. Maybe excavation uncovers poor soil. Maybe material prices jump before you place an order. Maybe a remodel reveals damage hidden behind walls. Suddenly, the profit you worked hard to build into the job starts slipping away.<\/p>\n<p>Unexpected costs are an inevitable part of any construction <\/p>\n<div style=\"display:none;\" class=\"postcatlist\"><a href='https:\/\/www.buildxact.com\/nz\/tag\/ai-construction-software\/'><span>AI Construction Software<\/span><\/a> <a href='https:\/\/www.buildxact.com\/nz\/tag\/construction-contingency\/'><span>construction contingency<\/span><\/a><\/div>\n","protected":false},"author":55,"featured_media":18963,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[25],"tags":[382,391],"contributing_author":[381],"class_list":["post-18961","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-ai-construction-software","tag-construction-contingency","contributing_author-steve-miller"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.1 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Construction Contingency: How to Budget for the Unexpected | Buildxact US<\/title>\n<meta name=\"description\" content=\"Learn how to calculate, manage, and track construction contingency funds. Includes examples, best practices, and a free contingency budget template.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Contingency: How to Budget for the Unexpected\" \/>\n<meta property=\"og:description\" content=\"Learn how to calculate, manage, and track construction contingency funds. Includes examples, best practices, and a free contingency budget template.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/\" \/>\n<meta property=\"og:site_name\" content=\"Buildxact NZ\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-12T15:00:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-13T04:50:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.buildxact.com\/nz\/wp-content\/uploads\/sites\/16\/2026\/10\/Image-1-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1856\" \/>\n\t<meta property=\"og:image:height\" content=\"1136\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"foundation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"foundation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/\"},\"author\":{\"name\":\"foundation\",\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/#\\\/schema\\\/person\\\/9065873438068b02441d0da8cc981fb0\"},\"headline\":\"Construction Contingency: How to Budget for the Unexpected\",\"datePublished\":\"2026-10-12T15:00:26+00:00\",\"dateModified\":\"2026-10-13T04:50:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/\"},\"wordCount\":2160,\"publisher\":{\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2026\\\/10\\\/Image-1-2.png\",\"keywords\":[\"AI Construction Software\",\"construction contingency\"],\"articleSection\":[\"Blogs\"],\"inLanguage\":\"en-NZ\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/\",\"url\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/\",\"name\":\"Construction Contingency: How to Budget for the Unexpected | Buildxact US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2026\\\/10\\\/Image-1-2.png\",\"datePublished\":\"2026-10-12T15:00:26+00:00\",\"dateModified\":\"2026-10-13T04:50:17+00:00\",\"description\":\"Learn how to calculate, manage, and track construction contingency funds. Includes examples, best practices, and a free contingency budget template.\",\"inLanguage\":\"en-NZ\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-NZ\",\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/blog\\\/construction-contingency-how-to-budget-for-the-unexpected\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2026\\\/10\\\/Image-1-2.png\",\"contentUrl\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2026\\\/10\\\/Image-1-2.png\",\"width\":1856,\"height\":1136},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/#website\",\"url\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/\",\"name\":\"Buildxact NZ\",\"description\":\"Estimating &amp; Job Management Software\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-NZ\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/#organization\",\"name\":\"Buildxact NZ\",\"url\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-NZ\",\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2022\\\/01\\\/buildxact-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2022\\\/01\\\/buildxact-logo.png\",\"width\":278,\"height\":68,\"caption\":\"Buildxact NZ\"},\"image\":{\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/#\\\/schema\\\/person\\\/9065873438068b02441d0da8cc981fb0\",\"name\":\"foundation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-NZ\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g\",\"caption\":\"foundation\"},\"url\":\"https:\\\/\\\/www.buildxact.com\\\/nz\\\/author\\\/foundation\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Construction Contingency: How to Budget for the Unexpected | Buildxact US","description":"Learn how to calculate, manage, and track construction contingency funds. Includes examples, best practices, and a free contingency budget template.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/","og_locale":"en_US","og_type":"article","og_title":"Construction Contingency: How to Budget for the Unexpected","og_description":"Learn how to calculate, manage, and track construction contingency funds. Includes examples, best practices, and a free contingency budget template.","og_url":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/","og_site_name":"Buildxact NZ","article_published_time":"2026-10-12T15:00:26+00:00","article_modified_time":"2026-10-13T04:50:17+00:00","og_image":[{"width":1856,"height":1136,"url":"https:\/\/www.buildxact.com\/nz\/wp-content\/uploads\/sites\/16\/2026\/10\/Image-1-2.png","type":"image\/png"}],"author":"foundation","twitter_card":"summary_large_image","twitter_misc":{"Written by":"foundation","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/#article","isPartOf":{"@id":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/"},"author":{"name":"foundation","@id":"https:\/\/www.buildxact.com\/nz\/#\/schema\/person\/9065873438068b02441d0da8cc981fb0"},"headline":"Construction Contingency: How to Budget for the Unexpected","datePublished":"2026-10-12T15:00:26+00:00","dateModified":"2026-10-13T04:50:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/"},"wordCount":2160,"publisher":{"@id":"https:\/\/www.buildxact.com\/nz\/#organization"},"image":{"@id":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/#primaryimage"},"thumbnailUrl":"https:\/\/www.buildxact.com\/nz\/wp-content\/uploads\/sites\/16\/2026\/10\/Image-1-2.png","keywords":["AI Construction Software","construction contingency"],"articleSection":["Blogs"],"inLanguage":"en-NZ"},{"@type":"WebPage","@id":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/","url":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/","name":"Construction Contingency: How to Budget for the Unexpected | Buildxact US","isPartOf":{"@id":"https:\/\/www.buildxact.com\/nz\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/#primaryimage"},"image":{"@id":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/#primaryimage"},"thumbnailUrl":"https:\/\/www.buildxact.com\/nz\/wp-content\/uploads\/sites\/16\/2026\/10\/Image-1-2.png","datePublished":"2026-10-12T15:00:26+00:00","dateModified":"2026-10-13T04:50:17+00:00","description":"Learn how to calculate, manage, and track construction contingency funds. Includes examples, best practices, and a free contingency budget template.","inLanguage":"en-NZ","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/"]}]},{"@type":"ImageObject","inLanguage":"en-NZ","@id":"https:\/\/www.buildxact.com\/nz\/blog\/construction-contingency-how-to-budget-for-the-unexpected\/#primaryimage","url":"https:\/\/www.buildxact.com\/nz\/wp-content\/uploads\/sites\/16\/2026\/10\/Image-1-2.png","contentUrl":"https:\/\/www.buildxact.com\/nz\/wp-content\/uploads\/sites\/16\/2026\/10\/Image-1-2.png","width":1856,"height":1136},{"@type":"WebSite","@id":"https:\/\/www.buildxact.com\/nz\/#website","url":"https:\/\/www.buildxact.com\/nz\/","name":"Buildxact NZ","description":"Estimating &amp; Job Management Software","publisher":{"@id":"https:\/\/www.buildxact.com\/nz\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.buildxact.com\/nz\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-NZ"},{"@type":"Organization","@id":"https:\/\/www.buildxact.com\/nz\/#organization","name":"Buildxact NZ","url":"https:\/\/www.buildxact.com\/nz\/","logo":{"@type":"ImageObject","inLanguage":"en-NZ","@id":"https:\/\/www.buildxact.com\/nz\/#\/schema\/logo\/image\/","url":"https:\/\/www.buildxact.com\/nz\/wp-content\/uploads\/sites\/16\/2022\/01\/buildxact-logo.png","contentUrl":"https:\/\/www.buildxact.com\/nz\/wp-content\/uploads\/sites\/16\/2022\/01\/buildxact-logo.png","width":278,"height":68,"caption":"Buildxact NZ"},"image":{"@id":"https:\/\/www.buildxact.com\/nz\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.buildxact.com\/nz\/#\/schema\/person\/9065873438068b02441d0da8cc981fb0","name":"foundation","image":{"@type":"ImageObject","inLanguage":"en-NZ","@id":"https:\/\/secure.gravatar.com\/avatar\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g","caption":"foundation"},"url":"https:\/\/www.buildxact.com\/nz\/author\/foundation\/"}]}},"_links":{"self":[{"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/posts\/18961","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/users\/55"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/comments?post=18961"}],"version-history":[{"count":0,"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/posts\/18961\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/media\/18963"}],"wp:attachment":[{"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/media?parent=18961"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/categories?post=18961"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/tags?post=18961"},{"taxonomy":"contributing_author","embeddable":true,"href":"https:\/\/www.buildxact.com\/nz\/wp-json\/wp\/v2\/contributing_author?post=18961"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}