How Buildxact and The Home Depot Speed Material Ordering
Learn how to order from The Home Depot using Buildxact to track pricing, material stock and receipts without switching between multiple systems.
Learn how to order from The Home Depot using Buildxact to track pricing, material stock and receipts without switching between multiple systems.
Here, we will look at why proposals are important, what they should include, and how to create a construction proposal that wins you bids.

If you’ve ever invoiced a job and been paid less than what you billed, you’ve already dealt with retainage.
You finish a stage, send through a $50K invoice, and $45K lands in your account. The rest is held back. Sometimes for months.
On paper, it’s standard practice. In reality, it creates a gap between the work you’ve completed and the cash you actually have in the b
Compare the best landscape estimating software for small residential builders. Includes benefits, essential features, and reviews of leading platforms.

Spreadsheets break, whiteboards get erased, and email threads lose change orders. For residential contractors balancing estimates, schedules, subs, and clients all at once, the cracks in a manual system show up fast, and they’re expensive.
Home builder software exists to close those gaps. The right platform brings your estimate, schedule, budget, and client communication
Running a building business means juggling a lot, and most of it sits with you. Bids, schedules, subcontractors, dealers, clients.
It’s all happening at once, often across multiple jobs.
The real challenge isn’t the workload. It’s that everything lives in different places.
You probably already know software could help. But the idea of learning a whole new system? Not
There are ways to automate many of the functions of a typical construction project manager. Project management software allows you to save time and become more productive to handle more work and have time for yourself.
You finish a site visit, head back to the office, and open Excel to build the estimate. Material costs, labor rates, and site measurements are spread across multiple tabs. Two hours in, you adjust one formula, and something breaks.
A linked field goes blank. Now the next hour goes to tracing the error instead of finishing the bid, and the proposal goes out late.
That’
Business decisions are won or lost on the strength of their return on investment. It’s no different if you’re a small builder or remodeler looking to increase profit and take your business to the next level. Investing in cloud-based construction software is a cost-effective way to help make this a reality.
You finish a site visit, head back to the office, and open Excel to build the estimate. Material costs, labor rates, and site measurements are spread across multiple tabs. Two hours in, you adjust one formula, and something breaks.
A linked field goes blank. Now the next hour goes to tracing the error instead of finishing the bid, and the proposal goes out late.
That’
A homeowner sends over the project specifications. At the bottom, one line says: “Please include a bill of quantities with your submission.”
Normally, you submit a bid. This time, that won’t be enough.
You start figuring out what that actually means in practice, not in theory, but for the way you already estimate jobs. How do you turn your numbers into something structured en
Compare 6 framing estimating tools built for residential builders. See which ones connect your takeoff, pricing, and bid in one system.
Cloud-based construction takeoff software allows you to speed up the process while not compromising accuracy. Top-notch accuracy can make a big difference for a custom home builder’s bottom line since they will have the capacity to take on more work because they have more time.
Digital technologies are becoming an increasingly important part of the construction sector, and companies that do not adopt them may find themselves at a disadvantage as they increasingly lack the ability to efficiently manage their workflows.
A construction estimator prepares estimates for the overall cost of a proposed project. They visit construction sites and work closely with construction management teams, playing an integral part in any construction project.
Midway through a build, materials arrive at a higher price than the estimate. No one flags it, so the job keeps moving.
A few weeks later, someone approves a change on site, but it never makes it back into the estimate. A few small items get handled “later” and never reconciled.
At closeout, the margin comes in lighter than expected. Nothing blew up on site, so the job ra
Compare the best drywall estimating software for residential builders. See which tools prevent missed materials, price drift, and fragile estimates.
The hardest part of being a successful builder and business owner is not the craft of building. It’s the day-to-day running and growing your business. The issues facing the construction industry affect large and small companies alike
While the industry continues to expand, technology remains a catalyst for crucial industries, including the built environment and one of the largest and most influential groups today: millennials. Not only are they able to adopt new technology quickly, but they are also ready to buy a home.
For most small builders, remodelers, and contractors, the owner does all the duties of a project manager and a whole lot more. There are ways to automate many of the functions of a typical construction project manager, achieves. Project management software allows you to save time and become more productive to handle more construction projects and have time for yourself.
Now more than ever, it’s essential to keep your business alive throughout the economic recovery and into the future by ensuring you’re making a profit and reaching your goals.
There are many reasons why this may not happen — in good times and not so good times — such as poor money management, no marketing strategy, inactive quotes, and inaccurate estimates.
We know it can be a struggle to balance hands-on job site work and running the day-to-day business, but there’s a better way. Here are the top features’ builders like you are using when they choose Buildxact
Discuss changes within the industry and the forces impacting pro dealers and builders such as the increase of home building demand across the United States and a decrease in available supply.
Find out the actual cost of starting a construction company in 2026. Includes example costs for general contractors, specialty trades, and remodelers.
Productive construction managers have clear processes and procedures for getting the work done.They rely on the effective execution of these processes to ensure the project stays on time and on budget.
Learn how Precision Homes works with Buildxact and The Home Depot to estimate remodels so that the right materials and quantities flow to the right jobs.
Learn how the pros at Xpres Kitchen & Bath went from juggling multiple software tools to using the leading software in home construction management.
Find out how Keith Perez, of TXN Remodeling N Construction, has transformed his 6-year-old remodeling business using Buildxact construction management software.
Learn how the founders of VW Building Projects put an end to the large amounts of time in the office writing project estimates.
Estimating took a toll on Josh in terms of his time and health. Learn how software saves time and grows his business.
Learn how successful custom home builders use digital online estimating to get accurate bids quickly out the door so they can get back to the job site.
Hear from Jack Clough of Nook Construction has he explains how Buildxact has taken his business to the next level.
Ron of Marcella Building LLC hasn’t been using Buildxact for a long time, but he’s already noticing significant benefits.
“There really isn’t anything else in this price point that has all the functionality that Buildxact has, and that’s why we decided to go with you guys.”

“I was writing it all out on emails and it was taking forever. Buildxact was just a no-brainer for me. It was exactly what I needed.”
Los proveedores de familia hacen sacrificios grandes para poder proveer una buena vida a sus seres queridos y poder alimentarlos.

Learn from Jennie Akins on how she used Buildxact to learn about the construction industry, and started on doing job quotes.
John McBride’s world consisted of stocks, bonds, and everything in between from Wall Street. Read how, McBride, owner of BlackTree LLC, uses modern construction management software to have better control of his construction business
Blue Bexar is a small and growing residential construction company in San Antonio, Texas, with three full-time employees. Dustin Ballew is the owner and serves as the general contractor and manager of pretty much everything. As a general contractor, the company does anything from bathroom remodels to new builds to high-end decking.
Buildxact solved Matthew’s need for speed and accuracy from takeoffs to the bidding process. He’s fielding few phone calls and clarifying fewer details because Buildxact lays everything that needs to be bid. Accuracy has become more and more critical for builders because a little mistake five years ago is a huge mistake in today’s environment when it comes to material costs.
With Buildxact, Jeremy has found a way to dramatically speed up construction projects, starting with creating his own takeoffs. And there’s a lot less disconnect with suppliers. Buildxact lists everything in the takeoff speeding up the time it takes both subs and suppliers to submit bids.
Estimating is one of the most critical components of running a profitable business. It’s essential to be as accurate as possible and using software like Buildxact automates formulas you may use on a spreadsheet into a streamlined process.
“What used to take me 10 hours for a whole house estimate now takes me four hours and that’s time I can spend on scaling my business for the future,”
This video covers how to use item assemblies for decking and flooring.
How to manage wall framing and junctions using Buildxact item assemblies.
This video will take you through how to set up a drywall and insulation item assembly.
This video will show you how to load your own price catalog into Buildxact.
This video covers completion percent invoicing
This video covers cost plus invoicing.
This video is for people who’ve just been invited to a project via the Buildxact Client Portal.
Learn about creating invoices and refundable deposits, go through what your invoices look like and how to print, edit invoices and change orders.
Ready to learn how AI impacts residential construction? With this eBook learn the basics of AI-based tools and how home builders of all sizes can in minutes fully understand the size, scope and cost of their projects.
Ready to learn how AI impacts residential construction? With this eBook learn the basics of AI-based tools and how home builders of all sizes can in minutes fully understand the size, scope and cost of their projects.
Looking to become a residential builder? Check out our latest eBook to learn how to get started and established in the industry.
Looking to become a residential builder? Check out our latest eBook to learn how to get started and established in the industry.
Looking to become a residential builder? Check out our latest eBook to learn how to get started and established in the industry.
Learn how to improve your home construction management with these six key tips and tricks.
Learn how to accurately estimate construction project costs with our eBook.
Learn how to build a winning construction proposal with this helpful guide.
Learn how tendering works for home building, and how your business can use Buildxact to win more work.
Learn how to estimate quicker and more accurately with our ultimate guide to accurate estimates for home builders.
Learn construction bidding secrets you can use right now to revitalize your construction quotes and win more work.
Learn the essentials of a great preconstruction estimate and quote
Learn how to build your business by creating quality branding.
Avoid wastage and save your business money by learning the ins and outs of lean construction.
Learn strategies you can implement to improve your profit margin
Learn the six ways dealers can boost the success of their builder customers.
Download this eBook to learn three steps to having a profitable relationship with your dealers
Download this infographic to understand the mistakes pro dealers are making that’s costing them customers.
Download this infographic to get a deeper insight into how material delays are impacting builders’ profits.
Learn how top dealers are using SaaS to create deeper relationships with builders.
Learn how to estimate faster with your construction takeoffs with cloud-based construction management software. Download the ebook now!
Learn how to maximize your profits by using cloud-based construction management software. Download the ebook now!
Social media, remote work, and online communication tools — and today, companies and consumers alike are researching and purchasing online.
The right construction management software can save you loads of time and help you be more profitable. This guide will take you through the ins and outs of construction management software, key features to look for, and what a quality software can do for you and your business.
When estimating the costs of a construction project, it’s important to include all of the costs in order to stay profitable. These are typically split into hard and softs costs. Check out our guide where we explore the difference between these two types of costs, give some examples of soft costs, and explain why soft costs need to be included in project budgets.
Estimating software helps streamline the bidding process, reduces errors, and makes pricing more accurate. Learn more with this helpful guide.

Learn how Buildxact and The Home Depot are working together to save time estimating, ordering and tracking materials.

In this webinar, learn how Buildxact and Building Talent Foundation help you operate more efficiently with a reliable crew.

Watch this webinar and learn how to turn the needs of homeowners into profit for your home construction business.
Watch this webinar and learn how traditional marketing for your construction business is not enough. Learn to create a lead-generation system.
Learn to keep up with the changing home construction market with modern construction management software.
Buildxact and the Association of Professional Builders deliver tips from the annual State of the Residential Construction report.
Watch this webinar for a simple, step-by-step approach to adopt and integrate technology into your home construction business.
Learn how RENDR and Buildxact make estimating quicker and easier. With the right technology, you can win more work and be more profitable.
Learn the challenges ahead for the lumber market from industry experts at Do It Best, MaterialsXchange and Deacon Lumber Company.
Ready to get the most out of Buildxact? This online webinar offers some of the best tips and tricks in home construction management.

Don’t get lost in the AI hype! Learn what really matters to custom home builders when it comes to coming AI technology.
Yes, you can be productive over the holidays! Watch this webinar to learn how you can gather leads for the New Year.
We want to help you grow your business in 2025! Watch this webinar to learn what marketing systems set you up to capture the attention of your ideal clients.
Home builders today see challenges on all fronts by global market forces. Learn how industry experts set themselves up to beat the market.
Learn how construction software and other technologies improve the way home builders work.
Watch this webinar for a masterclass in what matters to construction pros when it comes to building a first-class marketing website.
Watch this webinar to discover how buyers finance their dream homes and learn the features buyers splurge on and those they skip.
Watch this webinar to better understand why It’s impossible to grow and scale your business until you master the art of pricing.
Learn best practices that hundreds of builders have used to reinvent their business and work more efficiently.
Grow your business when you bid more jobs with Buildxact. Learn all the online features and how easy it is to use construction management software.
Yes, you started your business to build beautiful homes, but true success means earning profits. Let’s show you how it’s done.
We use cookies to give you the best online experience. Cookies keep our site secure and reliable. They let us personalise Buildxact.com to you and help us analyse how the site is used.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
CloudFlare provides web performance and security solutions, enhancing site speed and protecting against threats.
Service URL: developers.cloudflare.com (opens in a new window)
These cookies are needed for adding comments on this website.
Google Tag Manager simplifies the management of marketing tags on your website without code changes.
These cookies are used for managing login functionality on this website.
Marketing cookies are used to follow visitors to websites. The intention is to show ads that are relevant and engaging to the individual user.
A video-sharing platform for users to upload, view, and share videos across various genres and topics.
Service URL: www.youtube.com (opens in a new window)
You can find more information in our Cookie Policy and Privacy Policy.